Extension Notice of Extension and Reconstruct Engineering Investigation and Design Project of Xinyihe Bridge

The investigation and design project for the extension and reconstruction of the Xinyihe Bridge of the Shuyang County Transportation Bureau has been approved. The construction funds have come from the finance and have been implemented. The project has already met the conditions for bidding and the project is now undergoing an open tender.

1. Project Overview and Bidding Scope
1.1 Project location: Yucheng Street, Youyang County
1.2 Project Scale: The Fenhe Bridge is located at the Old 205 National Road across the Xinyi River. The bridge is 1269.26 meters long and consists of two old and new bridges. The east side of the old bridge is 8.5 meters wide. The superstructure is a double arch and the west side is T-shaped. The bridge has a width of 14.5 meters and the superstructure is a simple-supported T-beam. The distance between the two bridges is 3 meters and the total width of the section is 26.5 meters. It is now ready to build a new 8.5-meter-wide bridge 3 meters west of the existing T-beam bridge (upstream) and at the same time repair and reinforce the existing bridge.
1.3 Duration: 40 calendar days
1.4 Quality Requirements: Qualified
1.5 Time and method for payment of progress payment:
(1) All construction drawing design documents are completed on schedule and sent to the contractor. After reviewing, modifying and approving by the contractor or the higher authorities, 60% of the survey design fees are paid to the designer.
(2) After the project is handed over and accepted, the contractor pays the designer 35% of the survey design fee and 5% of the warranty money.
1.6 The budget price of the project is 2,588,400 yuan, and the maximum price is 2.04 million yuan, which is higher than or equal to the value-for-service standard of the ceiling price.
2. Qualification method
The project is tendered after the qualification examination, qualification examination method: qualified system.
3. Evaluation method
The bid evaluation adopts a comprehensive evaluation method.
The bid evaluation committee will score the bid documents that meet the substantive requirements of the bid invitation documents in accordance with the scoring standards stipulated in this chapter. The overall score of each bidder is the sum of the business and technical scores and quotation scores, and the winning bids are awarded in descending order of scores. candidate. The bid evaluation score calculation retains two decimal places (rounded down). If the final composite score is the same, the highest score of the first envelope (business and technical documents) of the bidding document is ranked first. If the business and technical documents still have the same score, the bid The lowest bidder ranks first. If the bid price is the same, the higher bidder’s registered capital ranks first.
4. Applicant qualification requirements
4.1 Qualification Category and Level of Applicants: Professional qualifications for engineering design or Class A design qualifications for highway industry (highway or oversized bridges).
5.1 For interested bidders, please contact us at 15:00 on February 15, 2017 to February 21, 2017.

UHD Led Display-PJ

As one of most popular cabinet type, Priva LED's PJ series products is much easier for installation, maintenance and transportation. This series of products covers LED Screen from P1.56mm, P1.875mm, P2mm and P2.5mm. PJ series UHD led display support front acccess& back access. Modular design easier for maintenance. Lock for up and down, left and right make installation easier and fast. PJ series UHD led screen packed with modules and cabinet together, It will also speed up the installation and transportation. If more information about this sereries of LED display, Pls contract us!

UHD Video wall, UHD led screen, UHD led display

Shenzhen Priva Tech Co., Ltd. , https://www.privaled.com