Keep these 19 steps in mind and easily solve the housing renovation problem.

[Home Theater Network HDAV.com.cn] To install a new house, for a family, it is one of the major events that must be experienced in life. This means not only the need for large expenses, but also a lot of time and experience. Whether the house is environmentally friendly, comfortable and so on affects the quality of life of the family. When it comes to decoration, "there is no way to start" is the common aspiration of most of the first-time decoration of Xiaobai. Today, Xiaobian will talk to you about some of the necessary renovations. Preparation process.

First, the early design

It is mainly designed according to their own living habits. For example, audio-visual enthusiasts will consider the design of the audio-visual room, contact the decorator and acoustic designer to design the scheme, and make a detailed measurement of their room. The measurement contents mainly include: tiling Area, wall paint area, wallpaper area, floor area; clear main wall size, especially the wall size of the furniture to be designed later.

Second, the main body of the change

Entering the construction stage, the main body demolition is the first project, including demolition, wall building, shovel wall, heating, plastic window and so on.

Third, hydropower transformation

Before the water circuit was rebuilt, the main structure demolition should be basically completed. The first measurement of the cabinet should also be carried out between the hydropower transformation and the main body demolition. mainly include:

See if the position of the hood socket affects the installation of the hood later;

See if the position of the water meter is appropriate;

Look at the location of the water outlet to make it easier to install the sink later.

The laying of the audio line, the laying of the audio and video HD line.

Fourth, woodworking

Woodworking, bricklayers, and oilers are the "three brothers" in the construction process. The basic order of appearance is: wood - tile - oil. The basic principle of appearance is - who is dirty and who is first. In a sense, woodworking activities such as bag risers, decorative ceilings, and plaster lines can also be considered as a detailed link of the main body.

Five, tiling

In the process of “Washer Buddy”, the following three links are also involved:

Installation of door stone and marble window sill.

Installation of floor drains.

The installation of the hood.

"Wattenger second child" leaves the market. At this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.

Six, brush wall paint

The "oiler's third child" entered the market, mainly finishing the wall surface treatment, brushing the topcoat, and painting the furniture for the "carpentry boss". Students who are ready to paste wallpapers only need to let the "oiler's third child" do the grassroots treatment on the wall of the wallpaper.

Seven, kitchen and bathroom ceiling

The cabinet ceiling is the first step in the installation process, and it is still continuing the “packaging” of the home. At the same time as the kitchen and bathroom ceiling, the kitchen's moisture-proof ceiling lamps and exhaust fans (Yuba) should have been bought. It is best for students to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave the thread and opening.

Eight, kitchen cabinet installation

After the top is over, you can install the door on the cabinet. At the same time, there is a sink (not including the upper and lower water) and the gas stove. Before installing the cabinet, it is best to coordinate the property to pass the gas. Because the gas stove needs to be tested after it is installed. .

Nine, wooden door installation

On the second day of the cabinet installation, as soon as the wooden door was measured more than a month ago, it was now ready for installation. If it is smooth, it is also the time of day, the hinge, the door lock and the ground suction to be installed at the same time. Students should prepare relevant hardware in advance.

Ten, floor installation

Floor installation needs to pay attention to the following issues:

1. Before installing the floor, it is best to let the factory go to the door to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or renovation teams will recommend that the students level the floor or level the leveling, which is subject to the actual survey of the floor manufacturer;

2. Before the floor is installed, the floor of the pavement floor of the home should be cleaned to ensure the dryness of the ground, so do not use water during the cleaning process.

3, when the floor is installed, if there are conditions, the cutting of the floor must be in the corridor.

Eleven, paving wallpaper

On the second day of floor installation, the house was cleaned up, and it could be laid on the wallpaper. If there were conditions, the floor should be protected on the same day. If there is no condition, it will be cleaned. It is no problem to hand over to the pioneering cleaning. Before laying the wallpaper, try to do "do not have anything" on the wall.

Twelve, radiator installation

On the second day after the wallpaper was laid, the students who replaced the radiator or removed the radiator could hang the radiator on the wall. Wooden door - floor - wallpaper - radiator, this is a generally accepted correct installation sequence, the first to install the wooden door is to ensure that the baseboard of the floor can be closely engaged with the door of the wooden door; the back of the wallpaper is mainly because of the floor The installation is dirty, dusty, and the wallpaper is seriously polluted.

Thirteen, switch socket installation

Students should have a detailed understanding or record of the number and location of the switch sockets in the natural environment of the home, especially for the students who affix the wallpaper, use the wallpaper knife to open the hole in the position of your switch socket.

Fourteen, lighting installation

Fifteen, hardware and sanitary ware installation

The upper and lower water pipes, bathroom accessories, toilets, drying racks, etc., which were bought before, are all installed.

Sixteen, cleaning

When pioneering cleaning, do not have furniture and unnecessary household appliances at home, try to maintain more "flat", so that the pioneering cleaning can be thoroughly cleaned.

Seventeen, furniture entering the market

As for the purchase time of furniture, it is necessary to finish the water circuit transformation at the earliest. In this way, we can only choose the basic size range of furniture.

Eighteen, home appliances enter the market

At this time, the entry of the home appliances, the installation, installation, audio and other audio and video equipment installation and commissioning, the preparation for staying!

Nineteen, home accessories

Home accessories, the final step in home improvement, and has been converted from decoration to decoration, including the installation of curtains are part of the home accessories. Home accessories also include consideration for buying some green plants, wall paintings, furnishings, and more. In short, after you stay, you are free to play.

More fresh and fun home theater information, please pay attention to home theater network http:// (WeChat: cnhifi), the country's most influential home theater audio player interactive media website.

Note: This article was transferred from Weihai Huiwei Audio Store. The article is an independent view of the author and does not represent the position of the home theater network.

The cassette type a/cs series include all types of cassette type a/cs which suitable for different markets, include cassette type a/cs with R410A and R22 gas, power supply of 220~240v/50Hz/1ph, 230v/60Hz/1ph, 380~415v/50Hz/3ph and 380~415v/60Hz/3ph.

Cassette Type Air Conditioner

Ceiling Aircon,Cassette Air Conditioning,Cassette Type Air Conditioner,Ceiling Cassette Air Conditioner

Foshan Dinghan Electrical Technology Co., Ltd , https://www.dinghanelectrical.com