Title: T-junction Traffic Lights (including LED Light Sources) at Caocheng Street, Chaohu City. Bulletin No.: 2009064 Announcement Date: April 9, 2009 Deadline: April 14, 2009 Tendering Agency: Province: Anhui Province - Chaohu Lake... Content: Dear Supplier:
According to the procurement plan issued by the financial department and the entrustment of the relevant units, Chaohu City Bidding and Purchasing Trading Center will conduct a public inquiry on the following goods and related services. Suppliers who meet the eligibility requirements are welcome to submit a price and service pledge that cannot be changed at this time in accordance with this letter.
1. Supplier qualification requirements:
1.1 Suppliers meeting the requirements of Article 22 of the Procurement Law of the People's Republic of China;
1.2 The registered capital is more than 500,000 yuan (including 500,000 yuan);
1.3 Other conditions stipulated by laws and administrative regulations.
2. Purchasing Information:
2.1 Purchasing needs:
I. Number of traffic signal control system projects at T-junction of Caocheng Street
Serial number name specification model unit quantity
1 single column
Conical signal light rod tapered Q235 steel pipe / upper diameter? 130 / down diameter? 220mm / height 7M set 1
2 full screen lights
Two-color countdown timer set 3
3 single F type signal pole
(two groups) column: φ300-360*8*6500mm
Cross arm: φ110-180*4*6000mm set 2
4 single column tapered crosswalk pole pole tapered Q235 steel pipe / upper diameter? 114 / down diameter? 195mm / height 3M set 6
5-person signal light
Two-color countdown timer set 6
6ç ¼Basic C25m311
7 installation, foundation
8 Remarks Installation and foundation include: basic steel bar, basic earthwork excavation, five-core cable (RVV5×1.5m┫/national standard), power cable (RVV3×2m┫/national standard) and lightning protection grounding of poles Sexual offer.
Second, the main technical parameters of traffic lights
(1) Traffic lights
1, features and performance
(1) Standard: in line with the GB14887-2003 standard of the People's Republic of China
(2) Appearance design: beautiful appearance, exquisite craftsmanship, easy to install in multiple combinations. The luminaire is an ultra-thin cast aluminum casing with a separate opening function.
(3) Light source: It adopts imported chip four-element ultra-high brightness light-emitting diode (LED adopts: HP or Corey), and its service life is more than 100,000 hours.
2, performance indicators
(1) Rated power: é¢å®š400mm single lamp rated power is less than or equal to 25W; Ф300mm single lamp rated power is less than or equal to 15W.
(2) Rated voltage: AC176-264V, 50HZ
(3) Luminous intensity: red 928CD, yellow 714CD, green 989CD
(4) Reference wavelength: red 625 ± 4 nm, yellow 591 ± 4 nm, green 505 ± 2 nm.
(5) Light source life: more than 100,000 hours
(6) Viewing angle: greater than 30
(7) Visible distance: Ф400mm signal light ≥400m, Ф300mm signal light ≥300m
(8) Shell protection level: ≥ IP53
(9) Temperature resistance: -40 ° C - + 75 ° C
(10) Insulation resistance: greater than 500MΩ
(11) Dielectric strength: withstand voltage 1440VAC
(12) Dustproof: in line with GB14887-2003 standard
(13) Anti-vibration: in line with GB14887-2003 standard
(14) Wind pressure resistance: 145KM/H
(15) Number of lamp chip tubes
Ф400mm red shoulder light chip: tube number ≥ 144
Ф400mm yellow shoulder light chip: tube number ≥ 144
Ф400mm green shoulder light chip: tube number ≥120
Ф300mm red, green dynamic pedestrian light chip: red tube number ≥70, green tube number ≥134
Ф300mm two-color digital display light chip: red tube number ≥98, green tube number ≥56
(two), signal pole
The signal light rod steel tube is welded on both sides, the weld is smooth, smooth, fine, no crack, undercut, slag, pores and other defects, no transverse weld. The light pole is required to resist the typhoon of 12 (including 12) typhoon. The cable outlets are smooth, and the top of the pole is enclosed with waterproof gas. The wall thickness is not less than the design requirements.
The light pole material is made of high quality low silicon carbon steel. The material performance meets the national standard. The inner and outer surfaces are hot dip galvanized and anticorrosive. The surface is sprayed with white and blue. The electrical door at the bottom of the pole does not affect the structural strength of the pole, and is convenient for electrical installation, and must have good waterproof performance and interchangeability. Specific requirements:
1. After the whole hot-dip galvanizing treatment, the exterior is white and blue sprayed, and the quality of spray is in line with national standards.
2, car lights octagonal long arm pole outer diameter: 360-300 mm, wall thickness: 8 mm, height 6500 mm, cantilever outer diameter: 180-110 mm, wall thickness: 4mm, arm length 6 000mm, see the style In the drawing, the rod is sprayed after hot-dip galvanizing, the bottom is 2 meters in blue, and the rest is white.
3, car line lamp 7m tapered rod: using tapered Q235 steel pipe, upper diameter ∮130mm, lower diameter ∮220mm, column height 7m, pipe wall thickness 4mm, style see drawing, rod hot-dip galvanized spray, bottom Blue is sprayed below 1.6m, and the rest is white.
4, pedestrian signal pole: tapered Q235 steel pipe / upper diameter? 114 / diameter 195mm / height 3M /, wall thickness: 4 mm, height 3000 mm, style see the picture, the rod is hot-dip galvanized, sprayed, The bottom is 1.2 meters in blue and the rest in white.
5. All the rods have grounding devices, and the grounding resistance meets the requirements of the national standard.
3. The qualifications and qualification documents of the production enterprise to be provided for the product.
1. Business license (registered capital not less than 5 million yuan), copy of national and local tax registration certificate;
2. Provide a copy of the Quality Supervision and Inspection Certificate of the Traffic Safety Product of the Ministry of Public Security;
3. Proof of performance in the past three years (the performance of signal engineering of more than 1 million is not less than 3, and a copy of the contract or a copy of the notice of winning the bid must be attached);
4. Other documents (if any) that are necessary.
2.2 Purchasing budget: 68,000.00 yuan
2.3 Payment method: 95% of the equipment is installed and adjusted after passing the test. After 12 months of operation, it is believed that there is no quality problem and the balance is paid in one lump sum.
2.4 Construction period requirements: 20 calendar days from the date of signing the contract.
3. The quotation letter constitutes:
3.1 The valid quotation signed by the legal representative of the supplier (unit price, total price, stamped with official seal), each goods or service must clearly indicate its own package number or serial number;
3.2 The supplier must provide the configuration plan, materials, main parameters of the equipment to be provided, and the country of origin;
3.3 Suppliers must provide evidence of similar project operating performance and more than three traffic signal construction projects in the past two years;
3.4 A copy of the business license of the enterprise legal person (copy, stamped with official seal);
3.5 Proof of the requirements of the inquiry letter (copy, stamped with official seal);
3.6 After-sales service commitment letter (with official seal);
Remarks: If the quotation letter submitted by the supplier does not meet the relevant requirements of the inquiry letter, the quotation letter will be processed according to the invalid quotation letter.
4. Quotation requirements:
4.1 Quotes are quoted in RMB.
4.2 This inquiry purchase takes the whole package quotation. Once the supplier's quotation is approved by the center, it is the contract price of the contract.
4.3 The supplier must report the unchangeable price and service commitment at one time in accordance with the requirements of the inquiry letter.
4.4 Only one quotation is allowed for each type of goods. Any product with multiple plans and multiple quotations will not be reviewed.
4.5 The supplier shall consider the market risk on its own. The price quoted shall include the tariff, agency fee, transportation, installation, commissioning, training, technical service, essential parts and accessories for all import links of the goods.
5. The quotation letter is submitted:
5.1 The supplier shall bind the quotation letter into a book and seal it. Sealed bag seals must be stamped with the official seal and the enquiry letter number, supplier name, address, contact information and postal code on the front of the sealed bag should be submitted to the designated delivery location before the deadline specified in this inquiry letter.
5.2 The supplier may also submit the quotation letter in the form of a fax before the inquiry deadline, but the resulting price and other information leakage consequences shall be borne by the supplier.
6. After sales service:
6.1 The goods provided shall be brand new, unused original qualified products;
6.2 The supplier must provide at least three years of free warranty period, and a free service to the site every six months during the warranty period;
6.3 The supplier must provide a lifetime warranty for the system;
6.4 After receiving the notification of the user's system failure, the supplier shall respond within 2 hours, arrive at the site within 12 hours, and eliminate the fault within 24 hours;
If you can provide other better services, you can provide it yourself in the service commitment. This commitment will serve as a reference for determining the deal.
7. Purchase margin:
Before the supplier submits the quotation letter, the required purchase deposit must be submitted. If the supplier fails to pay the purchase margin during the review, the bidding center has the right to refuse to accept the quotation letter.
The interests of the bidding center and the purchaser may be compensated from the supplier's purchase margin when the supplier's behavior is compromised.
7.1 The purchase margin is: 1,000 yuan;
7.2 Procurement Margin Validity Period: Procurement Margin shall remain valid for 30 days after the deadline for inquiry, excluding interest;
7.3 Purchasing deposits should be sent to the following address by wire transfer, bank draft, transfer, cash, etc.:
Account Name: Chaohu City Bidding and Purchase Trading Center
Bank of deposit: ICBC Chaozhou City Chaozhou Branch Office
Bank account
7.4 The supplier who pays the purchase margin in cash must deliver the full amount of cash to ICBC according to the account number in 7.3, and submit the full name, bank account and account number on the back of the payment voucher before the inquiry deadline. Central Finance Section.
7.5 When any of the following occurs, the Tendering Center will confiscate the Supplier Procurement Margin:
A. The supplier withdraws its quotation within the validity period specified in the inquiry letter;
B. The supplier of the transaction failed to sign the contract within the prescribed time limit for its own reasons;
C. Suppliers have collusion and provide false information and other illegal and irregular behaviors that affect the fairness of procurement.
7.6 Return of purchase margin:
The purchase margin of the unsuccessful supplier is refunded without interest within three working days after the deposit certificate and account number are submitted. The purchaser's purchase margin will be automatically converted into a performance bond. After the contract supplier delivers the contract and acceptance report of all the products to the bidding center for filing, the bidding center will refund the performance bond (without interest) in full or in part according to the performance.
7.7 The Dealing Supplier has not fulfilled the contract or has other breach of contract. The Tendering Center will have the right to confiscate its performance bond in full or in part.
8. Review principle:
8.1 The inquiry team shall recommend no more than two candidate candidates to the purchaser in accordance with the principle that the procurement requirements, quality and service are equal and the quotation is the lowest, in accordance with the supplier's quotation from low to high.
8.2 The purchaser can directly determine the supplier of the transaction according to the lowest evaluation price method, or inspect the transaction supplier's quotation letter and the authenticity of the relevant information according to the requirements of the inquiry letter, and then determine the supplier of the transaction. After confirming that the first transaction candidate supplier has a major problem and is rejected, the purchaser can inspect the second transaction candidate supplier.
9. Deadline for inquiry: 2?? At 17:00 on April 14, 1999
10. Place of submission of the quotation letter:
No. 180, Chaohu Middle Road (fourth floor of Material Building, service hall), Chaohu City Bidding and Purchasing Trading Center
11. There are no fees for this project. Company Name: Chaohu City Bidding and Purchasing Trading Center Contact: Su Hong, Luo Genyun Tel: 0565-2399311 E-mail: Fax: 0565-2399300 Postal Code: 238000 Address: 180 Chaohu Middle Road (4th Floor, Material Building)
According to the procurement plan issued by the financial department and the entrustment of the relevant units, Chaohu City Bidding and Purchasing Trading Center will conduct a public inquiry on the following goods and related services. Suppliers who meet the eligibility requirements are welcome to submit a price and service pledge that cannot be changed at this time in accordance with this letter.
1. Supplier qualification requirements:
1.1 Suppliers meeting the requirements of Article 22 of the Procurement Law of the People's Republic of China;
1.2 The registered capital is more than 500,000 yuan (including 500,000 yuan);
1.3 Other conditions stipulated by laws and administrative regulations.
2. Purchasing Information:
2.1 Purchasing needs:
I. Number of traffic signal control system projects at T-junction of Caocheng Street
Serial number name specification model unit quantity
1 single column
Conical signal light rod tapered Q235 steel pipe / upper diameter? 130 / down diameter? 220mm / height 7M set 1
2 full screen lights
Two-color countdown timer set 3
3 single F type signal pole
(two groups) column: φ300-360*8*6500mm
Cross arm: φ110-180*4*6000mm set 2
4 single column tapered crosswalk pole pole tapered Q235 steel pipe / upper diameter? 114 / down diameter? 195mm / height 3M set 6
5-person signal light
Two-color countdown timer set 6
6ç ¼Basic C25m311
7 installation, foundation
8 Remarks Installation and foundation include: basic steel bar, basic earthwork excavation, five-core cable (RVV5×1.5m┫/national standard), power cable (RVV3×2m┫/national standard) and lightning protection grounding of poles Sexual offer.
Second, the main technical parameters of traffic lights
(1) Traffic lights
1, features and performance
(1) Standard: in line with the GB14887-2003 standard of the People's Republic of China
(2) Appearance design: beautiful appearance, exquisite craftsmanship, easy to install in multiple combinations. The luminaire is an ultra-thin cast aluminum casing with a separate opening function.
(3) Light source: It adopts imported chip four-element ultra-high brightness light-emitting diode (LED adopts: HP or Corey), and its service life is more than 100,000 hours.
2, performance indicators
(1) Rated power: é¢å®š400mm single lamp rated power is less than or equal to 25W; Ф300mm single lamp rated power is less than or equal to 15W.
(2) Rated voltage: AC176-264V, 50HZ
(3) Luminous intensity: red 928CD, yellow 714CD, green 989CD
(4) Reference wavelength: red 625 ± 4 nm, yellow 591 ± 4 nm, green 505 ± 2 nm.
(5) Light source life: more than 100,000 hours
(6) Viewing angle: greater than 30
(7) Visible distance: Ф400mm signal light ≥400m, Ф300mm signal light ≥300m
(8) Shell protection level: ≥ IP53
(9) Temperature resistance: -40 ° C - + 75 ° C
(10) Insulation resistance: greater than 500MΩ
(11) Dielectric strength: withstand voltage 1440VAC
(12) Dustproof: in line with GB14887-2003 standard
(13) Anti-vibration: in line with GB14887-2003 standard
(14) Wind pressure resistance: 145KM/H
(15) Number of lamp chip tubes
Ф400mm red shoulder light chip: tube number ≥ 144
Ф400mm yellow shoulder light chip: tube number ≥ 144
Ф400mm green shoulder light chip: tube number ≥120
Ф300mm red, green dynamic pedestrian light chip: red tube number ≥70, green tube number ≥134
Ф300mm two-color digital display light chip: red tube number ≥98, green tube number ≥56
(two), signal pole
The signal light rod steel tube is welded on both sides, the weld is smooth, smooth, fine, no crack, undercut, slag, pores and other defects, no transverse weld. The light pole is required to resist the typhoon of 12 (including 12) typhoon. The cable outlets are smooth, and the top of the pole is enclosed with waterproof gas. The wall thickness is not less than the design requirements.
The light pole material is made of high quality low silicon carbon steel. The material performance meets the national standard. The inner and outer surfaces are hot dip galvanized and anticorrosive. The surface is sprayed with white and blue. The electrical door at the bottom of the pole does not affect the structural strength of the pole, and is convenient for electrical installation, and must have good waterproof performance and interchangeability. Specific requirements:
1. After the whole hot-dip galvanizing treatment, the exterior is white and blue sprayed, and the quality of spray is in line with national standards.
2, car lights octagonal long arm pole outer diameter: 360-300 mm, wall thickness: 8 mm, height 6500 mm, cantilever outer diameter: 180-110 mm, wall thickness: 4mm, arm length 6 000mm, see the style In the drawing, the rod is sprayed after hot-dip galvanizing, the bottom is 2 meters in blue, and the rest is white.
3, car line lamp 7m tapered rod: using tapered Q235 steel pipe, upper diameter ∮130mm, lower diameter ∮220mm, column height 7m, pipe wall thickness 4mm, style see drawing, rod hot-dip galvanized spray, bottom Blue is sprayed below 1.6m, and the rest is white.
4, pedestrian signal pole: tapered Q235 steel pipe / upper diameter? 114 / diameter 195mm / height 3M /, wall thickness: 4 mm, height 3000 mm, style see the picture, the rod is hot-dip galvanized, sprayed, The bottom is 1.2 meters in blue and the rest in white.
5. All the rods have grounding devices, and the grounding resistance meets the requirements of the national standard.
3. The qualifications and qualification documents of the production enterprise to be provided for the product.
1. Business license (registered capital not less than 5 million yuan), copy of national and local tax registration certificate;
2. Provide a copy of the Quality Supervision and Inspection Certificate of the Traffic Safety Product of the Ministry of Public Security;
3. Proof of performance in the past three years (the performance of signal engineering of more than 1 million is not less than 3, and a copy of the contract or a copy of the notice of winning the bid must be attached);
4. Other documents (if any) that are necessary.
2.2 Purchasing budget: 68,000.00 yuan
2.3 Payment method: 95% of the equipment is installed and adjusted after passing the test. After 12 months of operation, it is believed that there is no quality problem and the balance is paid in one lump sum.
2.4 Construction period requirements: 20 calendar days from the date of signing the contract.
3. The quotation letter constitutes:
3.1 The valid quotation signed by the legal representative of the supplier (unit price, total price, stamped with official seal), each goods or service must clearly indicate its own package number or serial number;
3.2 The supplier must provide the configuration plan, materials, main parameters of the equipment to be provided, and the country of origin;
3.3 Suppliers must provide evidence of similar project operating performance and more than three traffic signal construction projects in the past two years;
3.4 A copy of the business license of the enterprise legal person (copy, stamped with official seal);
3.5 Proof of the requirements of the inquiry letter (copy, stamped with official seal);
3.6 After-sales service commitment letter (with official seal);
Remarks: If the quotation letter submitted by the supplier does not meet the relevant requirements of the inquiry letter, the quotation letter will be processed according to the invalid quotation letter.
4. Quotation requirements:
4.1 Quotes are quoted in RMB.
4.2 This inquiry purchase takes the whole package quotation. Once the supplier's quotation is approved by the center, it is the contract price of the contract.
4.3 The supplier must report the unchangeable price and service commitment at one time in accordance with the requirements of the inquiry letter.
4.4 Only one quotation is allowed for each type of goods. Any product with multiple plans and multiple quotations will not be reviewed.
4.5 The supplier shall consider the market risk on its own. The price quoted shall include the tariff, agency fee, transportation, installation, commissioning, training, technical service, essential parts and accessories for all import links of the goods.
5. The quotation letter is submitted:
5.1 The supplier shall bind the quotation letter into a book and seal it. Sealed bag seals must be stamped with the official seal and the enquiry letter number, supplier name, address, contact information and postal code on the front of the sealed bag should be submitted to the designated delivery location before the deadline specified in this inquiry letter.
5.2 The supplier may also submit the quotation letter in the form of a fax before the inquiry deadline, but the resulting price and other information leakage consequences shall be borne by the supplier.
6. After sales service:
6.1 The goods provided shall be brand new, unused original qualified products;
6.2 The supplier must provide at least three years of free warranty period, and a free service to the site every six months during the warranty period;
6.3 The supplier must provide a lifetime warranty for the system;
6.4 After receiving the notification of the user's system failure, the supplier shall respond within 2 hours, arrive at the site within 12 hours, and eliminate the fault within 24 hours;
If you can provide other better services, you can provide it yourself in the service commitment. This commitment will serve as a reference for determining the deal.
7. Purchase margin:
Before the supplier submits the quotation letter, the required purchase deposit must be submitted. If the supplier fails to pay the purchase margin during the review, the bidding center has the right to refuse to accept the quotation letter.
The interests of the bidding center and the purchaser may be compensated from the supplier's purchase margin when the supplier's behavior is compromised.
7.1 The purchase margin is: 1,000 yuan;
7.2 Procurement Margin Validity Period: Procurement Margin shall remain valid for 30 days after the deadline for inquiry, excluding interest;
7.3 Purchasing deposits should be sent to the following address by wire transfer, bank draft, transfer, cash, etc.:
Account Name: Chaohu City Bidding and Purchase Trading Center
Bank of deposit: ICBC Chaozhou City Chaozhou Branch Office
Bank account
7.4 The supplier who pays the purchase margin in cash must deliver the full amount of cash to ICBC according to the account number in 7.3, and submit the full name, bank account and account number on the back of the payment voucher before the inquiry deadline. Central Finance Section.
7.5 When any of the following occurs, the Tendering Center will confiscate the Supplier Procurement Margin:
A. The supplier withdraws its quotation within the validity period specified in the inquiry letter;
B. The supplier of the transaction failed to sign the contract within the prescribed time limit for its own reasons;
C. Suppliers have collusion and provide false information and other illegal and irregular behaviors that affect the fairness of procurement.
7.6 Return of purchase margin:
The purchase margin of the unsuccessful supplier is refunded without interest within three working days after the deposit certificate and account number are submitted. The purchaser's purchase margin will be automatically converted into a performance bond. After the contract supplier delivers the contract and acceptance report of all the products to the bidding center for filing, the bidding center will refund the performance bond (without interest) in full or in part according to the performance.
7.7 The Dealing Supplier has not fulfilled the contract or has other breach of contract. The Tendering Center will have the right to confiscate its performance bond in full or in part.
8. Review principle:
8.1 The inquiry team shall recommend no more than two candidate candidates to the purchaser in accordance with the principle that the procurement requirements, quality and service are equal and the quotation is the lowest, in accordance with the supplier's quotation from low to high.
8.2 The purchaser can directly determine the supplier of the transaction according to the lowest evaluation price method, or inspect the transaction supplier's quotation letter and the authenticity of the relevant information according to the requirements of the inquiry letter, and then determine the supplier of the transaction. After confirming that the first transaction candidate supplier has a major problem and is rejected, the purchaser can inspect the second transaction candidate supplier.
9. Deadline for inquiry: 2?? At 17:00 on April 14, 1999
10. Place of submission of the quotation letter:
No. 180, Chaohu Middle Road (fourth floor of Material Building, service hall), Chaohu City Bidding and Purchasing Trading Center
11. There are no fees for this project. Company Name: Chaohu City Bidding and Purchasing Trading Center Contact: Su Hong, Luo Genyun Tel: 0565-2399311 E-mail: Fax: 0565-2399300 Postal Code: 238000 Address: 180 Chaohu Middle Road (4th Floor, Material Building)
OTHERS Brake Disc
Others Brake Disc,Others Auto Brake Disc,Others Car Brake Disc,Others Automobile Brake Disc
Zhoushan Shenying Filter Manufacture Co., Ltd. , https://www.renkenfilter.com