荔 Third, increase the number of road lighting project construction tender notice (re)


Tender No.: No tendering agent: Guangzhou Guangjun Engineering Supervision Co., Ltd. Owner: Zengcheng Local Highway Management Station Registration Deadline: 2009-10-29
Area: Guangdong Industry: Water Conservancy Bridge Construction, Electrical and Electronic Equipment

According to Yuefa's re-issuance of [2009] No. 586 and No. 587, Suifa changed the city [2009] No. 135, No. 136, and issued the [2009] No. 112, No. 113 document approval, and implemented funds to increase the city's local highways. The management terminal is now open to the public contractor for the construction of Zengcheng Sansan and the additional road lighting project construction, and the contractor is selected.
I. Project name: Zengcheng 荔3, additional road lighting project construction contractor 2. Tendering unit: Zengcheng Local Highway Management Station Contact: Mr. Zhong Telephone Tendering Agency: Guangzhou Guangjun Engineering Supervision Co., Ltd. Contact: Xu Ms. Telephone Tendering Supervision Agency: Zengcheng Transportation Bureau Complaint Telephone No. 3. Construction Site: Zengcheng 荔3, Additional Road Section 4 Project Overview: Zengcheng 荔三路 and additional road construction new streetlight project Bidding content and scale: There is only one bidding section, including: 1. The length of the Zengsan highway is about 13.02km, and new street lights are needed. Second, the length of the road added by Zengcheng is about 38.3km, and new street lights are needed. The scope is as follows: street lamp and base storage power cable, wire, line pipe, galvanized round steel grounding protection. Estimated contract price: 28 million yuan. 6. Source of funds: Municipal financial allocation 7. Time for registration and submission of prequalification application documents:
October 29, 2009 morning: 9:30-11:30, afternoon: 14:30-17:00
This project uses the qualification review to produce a formal bidder. When there are less than 5 qualified applicants, the bid inviting party may issue a supplementary notice and extend the registration time appropriately.
VIII. Application for registration and submission of pre-qualification application documents: Zengcheng Construction Engineering Trading Center, No. 12, Hanglu Road, Yucheng Street, Zengcheng, Guangzhou.
9. Conditions for the prequalification of bidders:
1. The bidder’s intention to participate in the bidding is clearly expressed, and the bidder’s representative is authorized to be valid;
2. The bidders are all qualified as independent legal persons and hold the business license of the legal person issued by the administrative department for industry and commerce, and operate according to national laws;
3. The bidders hold the enterprise qualification certificate and safety production license issued by the construction administrative department;
4. The bidder has the second-class or above professional contracting qualification for the urban and road lighting projects required for the project, and has the power installation certificate, and the registered capital of the secondary enterprise is not less than 5.6 million yuan;
5. The bidder intends to be the project leader of the project as a registered construction engineer of the municipal public works or mechanical and electrical installation engineering level, and holds the project manager safety training assessment certificate (Class B).
6. The bidder has completed the quality-qualified similar project performance in Guangzhou area since January 1, 2006. (Similar project refers to the single project cost of 15 million yuan that can be undertaken at the qualification level or above. Or above urban and road lighting projects). It is necessary to provide the notice of winning the bid, the construction contract, the completion acceptance report or the completion acceptance certificate (the construction price is subject to the notice of winning the bid). If the above information cannot prove the technical indicators of the scale of performance (referred to as area, height, span, pipe diameter, etc.), additional information indicating the technical indicators of performance shall be provided. It is necessary to provide a notice of winning the bid, a construction contract, and a completion acceptance report. If the above information cannot prove the technical indicators of the scale of performance (referred to as area, height, span, pipe diameter, etc.), additional information indicating the technical indicators of performance shall be provided.
Note: 1. The notice of winning the bid should be confirmed by the following units: Guangzhou Construction Engineering Trading Center and its branch, former Guangdong Construction Engineering Trading Center, former Guangzhou Construction Engineering Trading Center, and former Guangzhou Panyu District Construction Engineering Trading Center (tender Center), the former Guangzhou City Huadu District Construction Project Tender Management Office, the former Guangzhou Economic and Technological Development Zone Construction Engineering Trading Center, the Conghua City Construction Engineering Trading Center, and the Zengcheng Construction Engineering Trading Center.
2. For the professional project performance of individual bidding, it is necessary to provide the bidding notice, construction contract, completion acceptance report or completion acceptance certificate.
7. The bidder has signed and stamped the bid applicant's statement in accordance with the contents of Annexes III, IV and V.
8. About the joint bidding: This project does not allow the joint bidding.
9. Before the qualification examination, the informant and the informative filing information of the bidder and the person in charge of the project have been published on the Guangzhou City Construction Network.
X. The method for determining the official bidder:
1. If the number of bid applicants who meet the eligibility criteria for qualification examination is more than 5 and less than or equal to 12, all bidders who meet the eligibility requirements for qualification examination shall be the official bidders.
2. When more than 12 bid applicants meet the eligibility criteria for qualification examination, 12 randomly selected will become the official bidders.
3. If the number of bidders who meet the eligibility criteria for qualification examination is less than 5, the bidding will fail. The tenderer analyzes the reasons for the failure of the bidding, amends the bidding plan, and re-organizes the bidding after being reported to the relevant management department for approval.
11. If the tenderer fails to apply for a change in bidding or non-tendering due to two or more bidding failures, the final public bidding shall cancel the bidder's performance qualifications.
12. Accept the registration and qualification examination, and select the best (if any) in accordance with the qualification examination documents (Annex 1).
XIII. According to the “Notice on Forwarding the “Maximum Value Method for the Construction of Buildings and Municipal Infrastructure Projects for Bidding and Tendering” (Sui Building [2006] No. 539), the project is set up according to the law.
XIV. For details of the information to be submitted when bidding applicants are required to register, please refer to Appendix 2, “List of Bidder Applicants for Filing and Submitting Materials” (in triplicate, one copy of the original, if the original and the copy are inconsistent, the original shall prevail) The validity period of all the promised expressions stated in the application documents of the bidding applicant shall be not less than 90 days. The information submitted in the “List of Bidder Applicants for Filing of Filings” is not required to be submitted, and is not considered as unqualified. in accordance with.
15. The bidding unit shall send the legal representative or its authorized representative to participate in the Balling Club on time. The Ballet will be witnessed under the witness of Zengcheng Construction Engineering Trading Center, and the specific time will be notified in writing.
16. The bidder may sign a complaint with the Tendering Construction Office of Zengcheng Construction Project for any illegal and unfair content in this announcement and the bidding documents.
XVII. This announcement is published on Guangdong Investment Investment Network. The revision and supplement of this announcement shall be subject to the text published on the Guangdong Investment Promotion Website.
18. The bidder must be responsible for the authenticity of the submitted information. If it is found to be fraudulent or reported, it will be cancelled immediately after being verified by the higher authorities, and will be publicized on the Internet. It is forbidden to participate in the bidding activities of all construction projects invested by Zengcheng at all levels of financial funds within two years, and the tenderee and The construction administrative department shall deal with it according to the commitment signed by the bidder.
19. The tender notice document and the bidding documents use the GZZB200612-017-1 bidding document template. The differences between this announcement and the contents of the template are underlined. All underlined parts are part of this announcement and have the same effect as other parts.
Tenderer: Tendering Agency of Zengcheng Local Highway Management Station: Guangzhou Guangjun Engineering Supervision Co., Ltd.

Insulated Terminals

Insulated Terminals,Terminals,High-quality insulated terminals

Taixing Longyi Terminals Co.,Ltd. , https://www.longyicopperterminals.com