State Grid Hunan Electric Power Co., Ltd. repair company employees belonging to the area "two for one industry" property separation EPC project tender notice

State Grid Hunan Electric Power Co., Ltd. repair company employees belonging to the area "two for one industry" property separation EPC project tender notice

The tender number: HNTHZB2018-07
Tenderee: Hunan Xiangcheng Property Management Co., Ltd. Investment Amount: RMB 14.42 million Announcement of Bidding for EPC Project for Separation of Property of "Two-for-one Industry" of the State-owned Enterprises of Hunan Electric Power Co., Ltd.

1. Bidding conditions The tendering project of the State Grid Hunan Electric Power Co., Ltd. Maintenance company employee's family area "two for one industry" property separation EPC project has entered the tendering process, the tenderer is Hunan Xiangcheng Property Management Co., Ltd., the construction fund for the company To raise state-owned capital operating budget subsidies, in order to speed up the project construction, this project adopts the design and construction general contracting (EPC mode construction, the project has the tendering conditions, and the project is now open tender.

2. Project overview and scope of tender
2.1 Project Name: "Two-for-one-business" Property Separation EPC Project of the State-owned Enterprises of Hunan Power Co., Ltd.

2.2 Construction Site: Changsha City

2.3 Sizing: RMB 144.2541 million (The final amount is based on the estimated amount of construction drawings

2.4 Design and construction period: Within 20 calendar days after the issuance of the bid announcement, the in-depth design will be completed to achieve the “Construction Engineering Document Depth Regulations”, and a design and construction general contract will be signed, within 90 calendar days after the review of the design drawings is passed. , Complete the construction and pass the final acceptance.

2.5 Quality Requirements:

Design: The content and depth of the design document shall meet and meet the requirements of the “Provisions for the Depth of Architectural Design Documentation”.

Construction: In accordance with the requirements of the "Code for the Acceptance of Engineering Construction Quality", the project quality standards are qualified.

2.6 Construction Warranty Requirements: Implemented in accordance with the relevant provisions of the 80th order of the Ministry of Construction

2.7 Bidding scope: Including State Grid Hunan Maintenance Co., Ltd. Dongguashan Ercun Village, Tianxin District, Changsha City (Family Area of ​​6-10 Buildings, 16-19 Buildings of Staff and Workers, State Grid Hunan Maintenance Co., Ltd., Changshan Tianxin District, No. 1 Workers' Families Area, and State Network Hunan Maintenance Company Changsha City Tianxin District Daxuqiao No. 21 Red Stone Board Workers' Family Area, State Grid Hunan Maintenance Corporation Changsha City Tianxin District Jiefangsi Village Erdaoxiang Transitional Shelter Family Area Maintenance and Renovation Contents: Roof Waterproofing, Stairs Restoration, Repair of unit gates, restoration of public lighting, restoration of fire extinguishers, repair of water pipes, restoration of water cover, restoration of fences, restoration of greenery, etc. (The scope of the construction scope and budget quotations signed and approved by Party A shall prevail in the specific scope of construction.

3. Bidder qualification requirements
3.1 Having an independent legal personality and obtaining a business license in accordance with the law, the business license is in the period of validity; the construction enterprise outside Hunan Province shall go through the registration of the basic situation of the foreign enterprises in Hunan according to the requirements of Document No. 190 of Xiangjian Jianjian (taking Hunan Provincial Housing and Urban-rural Development "Network" is subject to registration or has a registration certificate (in the validity period);

3.2 Enterprise Qualification Requirements: The bidder shall have the qualifications for the general contracting of the construction project issued by the construction administrative department and the comprehensive qualifications for the engineering design issued by the construction administrative department or the construction industry (class B qualification of construction design, safety production The permit is in the validity period and has the corresponding design and construction capabilities in terms of personnel, equipment, funds, etc.

3.3 According to the article [2016] of Jianshi [2016], the general contracting company shall have corresponding project management professionals. The specific requirements are as follows:

3.3.1 Proposed Design Person in charge Requirements: Intermediate and above professional titles in architectural engineering;

3.3.2 Proposed construction person in charge requirements: Qualified and qualified registered building engineer of Building Engineering Grade and above, as well as an effective Safety Production Assessment Certificate B;

3.4 The person in charge of the proposed technology shall have a college degree or above, and a professional intermediate or above professional title corresponding to the project, and engage in relevant professional and technical management work for more than 5 years.

3.5 This project shall be equipped with at least one person responsible for the project, one technical person in charge, one person in charge of design, two construction workers, two safety personnel, and one quality person; the proposed construction worker shall obtain provincial housing and The qualification certificate for the construction workers issued by the urban and rural construction authority shall be obtained from the provincial-level housing and urban-rural development authority, and the certified quality officer shall obtain the provincial housing and urban and rural areas. Quality personnel post qualification certificate issued by the construction department. Construction project department project leader, technical person in charge, construction worker, safety officer, and quality member shall be appointed by the construction unit of the project, and the appointment document shall be issued in the name of the bidder. The name, ID number, and document number of the personnel shall be specified in the appointment document. (Or registered practice number, job title, etc.

3.6 Persons from key positions in enterprises outside the province are provided with job qualification certificates issued by the provincial departments of housing and urban and rural construction.

3.7 The certificate should be able to check the authenticity through the Internet, or provide a certificate of authenticity issued by the provincial department of housing and urban and rural construction. The enterprises outside the province are from the place where the enterprise is located (the municipal or above construction administrative department provides the key personnel of the construction project department with no proof of the project in progress (or provide the construction project signed by the legal representative of the bidder and sealed with the official seal of the enterprise legal person). There is no commitment letter for the construction of the key personnel in the department.

3.8 The key positions to be appointed for this bid must be the proof that the employees of the company have provided the social security payment for three consecutive months before the deadline for the submission of the bid for the labor security department.

3.9 Bidders may not have one of the following circumstances:

(1 is an affiliate organization (unit;

(2 is the supervisor of the bidding project;

(3 is the agent of the bidding project;

(4) To provide tender agency services for this tender project;

(5 was ordered to suspend business;

(6 property was taken over or frozen;

(7) Being a legal representative together with the supervisor or agent or bid agency of the tendering project;

(8) The controlling shareholder, agent-builder or bidding agency of this tendering project shall have mutual control or shareholding;

(9) The supervisors or agent-builders or tendering agencies of this tendering project shall serve or work with each other.

(10 units in charge are the same person or different units that have controlling or management relationships and may not participate in the bidding for the bidding project at the same time.

(11 Violation of laws, regulations, and other conditions stipulated in the bidding documents.

3.10 This tender accepts the Commonwealth bid. The Commonwealth bid shall meet the following conditions:

3.10.1 Each member of the Commonwealth shall have an independent legal personality and obtain a valid business license in accordance with the law. Each member who forms a consortium shall specify that one member shall be the lead person to form a bid for the consortium of the general contracting of the project, and the consortium leader shall be the design unit. No more than two units can form a consortium;

3.10.2 All parties to the consortium shall sign a consortium agreement in the format provided in the bidding documents to clarify the rights and obligations of the consortium leader and the parties;

3.10.3 The consortium leader is fully responsible for the quality and safety of the general project contracting project; the consortium leader is responsible for the construction unit according to the contract; the consortium member is responsible to the leader according to the consortium agreement or the sub-contract agreement; The leaders and members of the consortium shall bear joint and several liabilities for the construction unit regarding the responsibilities of the members;

3.10.4 When the parties to the consortium bid alone or participate in the bid of other consortiums in the same tendering project, the relevant bids are invalid.

3.10.5 The legal representative of each member of the Commonwealth shall issue a power of attorney authorizing the same person to act as an agent to handle bid matters. The power of attorney shall be signed and affixed with the official seal of the respective company by the legal representatives of the members of the Commonwealth.

4. Qualification Examination Methods and Evaluation Methods
4.1 The qualification review method for this project is post-opening qualification review.

4.2 The evaluation method of the project adopts a comprehensive evaluation method.

5. Performance bond The project performance bond is paid at 5% of the bid price.

6. Obtaining and clarification of tender documents and drawings
6.1 All interested bidders are invited to apply for registration procedures from April 21st, 2018 to April 25th, 2018, every day from 9:00 to 12:00 and from 14:00 to 17:00 (Beijing time and holidays). Obtain tender documents.

6.2 Each set of bidding documents is priced at RMB 400, which shall be paid before submission of tender documents.

6.3 Registration Please provide the original power of attorney, the original ID card and the following original documents for registration:

A copy of the business license

Qualification Certificate (Enterprise Construction Qualification Certificate) According to the Hunan Provincial Department of Housing and Urban-Rural Development Department Xiangjian Supervision [2016] No. 111, a copy of a new qualification class certificate with a two-dimensional code that is clearly identifiable and is affixed with the official seal of the bidder’s corporate entity may also be provided.

Safety production license copy

Enterprise Basic Account Opening License

The registration of the foreign construction enterprise's Hunan registration certificate or the outside of the province's Xiangxiang enterprise has been registered.

Appointed project leader to register certificate of construction engineer and project leader for safety production assessment certificate

Appointed Design Manager

Appointed Technical Director Certificate

Academic certificates and proof of work experience

Qualifications for post qualification certificates for construction workers issued by the provincial-level housing and urban-rural development authorities of the construction workers; safety certifications for safety personnel issued by the provincial-level housing and urban-rural construction authorities of the safety officer; provincial level for quality officers Qualified post qualification certificate issued by the competent department of housing and urban-rural development; if the key positions of the bidder provide post qualification certificate issued by the provincial department of housing and urban and rural construction, the certificate should be able to check the authenticity through the Internet, or provide Certificate of Authenticity of Certificate issued by the competent department of housing and urban and rural construction. The enterprises outside the province are from the place where the enterprise is located (the municipal or above construction administrative department provides the key personnel of the construction project department with no proof of the project in progress (or provide the construction project signed by the legal representative of the bidder and sealed with the official seal of the enterprise legal person). Personnel in key positions do not have a commitment letter for construction in progress;

The bidder’s proposed key positions for the construction project department have been paid social security certificates for three consecutive months before the deadline for submission of bids by the labor and social security department;

The legal representative and general manager issued in the name of the bidder shall not be the commitment letter of the key personnel of the construction project department;

In the name of the bidder, the appointed staff of key positions in the construction project department shall appoint documents; in the name of the bidder, the key personnel of the proposed construction project department shall have no commitment letter under construction.

Note: At the time of registration, the bidder must also submit the above-mentioned data individually and affix a copy of the official seal of the bidder’s corporate legal entity (not to be returned, the copies must be bound in order, and the cover should state “the name of the project, the bidder”. If the name and registration information do not meet the above requirements, the tenderer has the right to refuse to register.

The results of the review of all documents shall be based on the results of the review determined by the judges.

7.1 Deadline for the submission of bid documents (the deadline for submitting bids, the same and the opening time for the bids shall be 9:00 on May 11, 2018,

7.2 If the bid documents are delivered late or have not been delivered to the designated place or have not been sealed as required, or if the bidder fails to obtain the tender documents in accordance with clause 7.1 of the tender notice of this project, the bid inviter will refuse to accept it.

7.3 The authorizing agent must be the person responsible for the proposed project.

/p>

Contact: Chen Yumin

Cell phone

phone

mailbox:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderer.

Manual Hydraulic Valve Remote Control Device

The manual valve remote control device consists of a fixed manual hydraulic pump, a hydraulic driver and a butterfly valve. The device takes a single valve as the remote control operation object, and has the characteristics of compact structure, simple operation, convenient operation and maintenance, etc. It is suitable for remote opening and closing control of special position valves in oil tankers, chemical tankers, oil platforms and other ships.

marine Controls device,Manual hydraulic valve remote control device,black marine controls device

Taizhou Jiabo Instrument Technology Co., Ltd. , https://www.taizhoujiabo.com