Hefei City Lighting Construction Management Measures


【章名】 Chapter 1 General

Article 1 In order to strengthen the management of lighting planning and construction in this city, beautify the city's cityscape and promote commercial prosperity, these measures shall be formulated in accordance with relevant state regulations and in light of the actual conditions of this Municipality.

Article 2 The lighting fixtures referred to in these Measures refer to lighting fixtures, such as light boxes, neon lights, floodlights, contour lights, electronic displays, and laser beams.

Article 3 All units and individuals engaged in the planning, design, construction, production and management of lighting in the lighting planning area of ​​this Municipality shall abide by these Measures.

The fourth lighting planning area refers to:

(1) Both sides of the main roads of the city and their street-facing buildings;

(2) One ring (Caixi Road, Fengyang Road, Quanjiao Road, Tunxi Road, Cooperative Road) and the secondary roads on both sides of the commercial street;

(3) Urban bridges, wide-ranging pedestrian bridges, sidewalks, guardrails and other municipal facilities;

(4) Stations, docks, airports and other areas where lighting is required.

The lighting management department of the city can propose a lighting planning regional adjustment plan according to the needs of urban development.
Execution after approval by the municipal government.

Article 5 The Lighting Engineering Office of Hefei Municipal People's Government (hereinafter referred to as the Municipal Lighting Office) is the administrative department of the lighting work of this Municipality and is responsible for the specific implementation of these Measures.

The Hefei Municipal Engineering Facilities Monitoring Team is responsible for lighting management supervision.

Article 6 The municipal construction, planning, city appearance, industry and commerce, gardening, power supply, public security and other departments shall, in accordance with their respective duties, cooperate with the Municipal Lighting Office to do lighting management work.

【章名】 Chapter 2 Lighting Planning and Construction

Article 7 The Municipal Lighting Office shall, in conjunction with the planning, city appearance, industry and commerce departments, prepare the city's lighting professional planning, and implement it after approval by the municipal government.

Article 8 All units and individuals within the lighting planning area shall set up lighting according to the lighting planning requirements.

Article 9 The property rights units and users of various carriers in the lighting planning area shall support the construction of lighting projects.

Article 10 Lighting fixtures placed on municipal facilities and garden green spaces shall be subject to the approval of the administrative department.

Article 11 Newly built or rebuilt buildings in the lighting planning area shall be designed and constructed in accordance with the lighting planning requirements. When the commercial doors are to be decorated, the lighting projects shall be constructed according to the planning requirements. The department will not issue the Building Decoration Permit and the municipal administrative department will not handle the approval procedures for the road.

Article 12 Where the lighting is set in the lighting planning area, the construction unit shall submit the lighting design drawings and other materials to the Municipal Lighting Office for application. For those who meet the requirements, the “Lighting Construction License” will be issued by the Municipal Lighting Office.

If the lighting construction needs to change the original building facade and increase the height, the construction unit shall go through the formalities with the municipal planning department as required.

Article 13 The unit that undertakes the task of making lighting engineering must have the corresponding qualifications and receive the "Quality Certificate for Lighting Production" issued by the Municipal Lighting Office.

Article 14 The materials used in the construction of lighting projects must meet the quality standards, and the main raw materials should be approved by the Municipal Lighting Office.

Article 15 The Municipal Lighting Office shall formulate the technical standards, quotas, schedules, etc. of the lighting engineering, and inspect and supervise the production and installation of the lighting, and those who fail shall be ordered to make corrections within a time limit.

Article 16 After the completion of the lighting project, the Municipal Lighting Office and other relevant departments shall organize the inspection and acceptance.
Those who have not passed the experience shall not be put into use.

[ç« ç« ] Chapter 3 Lighting Management

Article 17 No unit or individual may damage or arbitrarily dismantle the lighting. For lighting fixtures that are too old to be used or affect the cityscape, the City Lighting Office shall order the construction unit to dismantle and reset it within a time limit.

Article 18 The installation of various store signs, billboards, etc. in the lighting planning area shall not affect the lighting effect and damage the lighting structure.

Article 19 If the lighting structure is damaged or the lighting display is incomplete, the city lighting office shall order the lighting unit to be repaired within a time limit.

Article 20 The lighting construction unit must light up according to the time specified by the city lighting office.

[ç« ç« ] Chapter 4 Awards and Punishments

Article 21 For units and individuals that have made outstanding achievements in the planning, construction and management of lighting projects, the Municipal Lighting Office may report to the municipal government for commendation and reward.

Article 22 If the lighting is not set up according to the lighting professional planning requirements, the Municipal Lighting Office may order it to be set within a time limit; if it is not set after the deadline, it shall be imposed a fine of 3000-5000 yuan.

If the lighting is not approved, and the overall planning of the lighting is affected, it shall be ordered to make corrections within a time limit; if it is not corrected within the time limit, a fine of 1,000 to 2,000 yuan shall be imposed.

Article 23 If the property rights unit or user unit of various carriers in the lighting planning area obstructs the installation and installation of lighting, the Municipal Lighting Office shall order it to make corrections within a time limit; if it fails to make corrections within the time limit, it shall be punished by 10
A fine of 00 to 2,000 yuan.

Article 24 If a unit that does not have the qualification for lighting production undertakes the lighting project without authorization, the city lighting office shall order it to stop working within a time limit, confiscate the illegal income, and may take 3,000 to 5 depending on the circumstances.
A fine of $ 000.

Article 25 If the raw materials for lighting production do not meet the quality standards and the quality of the lighting engineering is inferior, the city lighting office shall order the construction unit to make corrections within a time limit; if it fails to make corrections within the time limit, it shall be 1,000.
A fine of 2,000 yuan.

Article 26 If the lighting installation unit violates the provisions of Article 19 of these Measures, if the lighting is not repaired within the time limit, the city lighting office shall impose a fine of 3000-5000 yuan.

Article 27 Anyone who violates the provisions of Article 20 of these Measures and fails to light up according to the regulations shall be warned by the Municipal Lighting Office and ordered to make corrections; if he still fails to make corrections, he shall be fined 1,000 to 2,000 yuan.

Article 28 Anyone who obstructs or obstructs the lighting management and supervision personnel from performing their duties according to law shall be punished by the public security organ in accordance with the Regulations of the People's Republic of China on Public Security Administration Punishment, which constitutes a crime.
Investigate their criminal responsibility according to law.

Article 29 Lighting management and supervision personnel shall enforce the law impartially, prohibit abuse of powers, engage in malpractices for personal gains, and offenders shall be held accountable for their legal liabilities.

Article 30 If a party is dissatisfied with the punishment decision, it may be based on the Administrative Reconsideration Regulations and
The provisions of the Administrative Litigation Law of the People's Republic of China apply for reconsideration or prosecution. If the application for reconsideration or prosecution is not applied within the time limit and the penalty decision is not fulfilled, the Municipal Lighting Office shall apply to the people's court for compulsory execution.

【章名】 Chapter 5 Supplementary Provisions

Article 31 The Municipal Lighting Commission is responsible for the interpretation of these Measures.

Article 32 These Measures shall be implemented as of the date of promulgation

Multilayers PCB

Our circuit board manufacturing company has been serving high-tech fields such as electronic consumption, communication equipment, automotive electronics, power equipment, industrial control, medical care, security and military industry for a long time.

After establishment of more than 15 years,Liandajin always upholds the principle of "customer-centered and quality-oriented"to provide high-quality products and good services to customer.

6layers PCB Board,4Layers PCB,8layers PCB,Multilayer Curcuit Board,Multilayer Printed Circuit Board

Huizhou Liandajin Electronic Co., Ltd , https://www.ldjcircuitboard.com